Cost effective floor surface preparation
APPLICATIONS:
• For standard preparation work prior to bonding floor coverings
• On new substrates, e. g. cement screeds
• On existing surfaces in need of refurbishment
TECHNICAL DATA / PROPERTIES:
• Working time: 20 – 40 minutes
• Set to foot traffic: after 2 – 3 hours
• Ready for most coverings: approx. 24 hours
• Good strength
• For interior use
• Low-chromate content according to Regulation (EC) No 1907/2006 (REACH)
For more information vistit http://www.uzin.co.uk