Send message to MHG Heating Ltd.
Ask a question
Pricing/Quote
List of suppliers/where can I buy
Sample request
I have read and agree to the terms and conditions of usage and The Building Centre's Privacy Policy. Your request will be sent and shared to the selected manufacturers you submit a request to.

Find products

Use our product finder to search for products and materials

Subscribe to our newsletter to receive news about events and exhibitions, innovation and materials on the latest building product innovations, case studies and more.
I have read and agree to the terms and conditions of usage and The Building Centre's Privacy Policy.

Winstanley Road, Clapham

18 May 2013
Case study

Gas-fired boilers, system seperation plate heat exchangers, HWS plate heat exchangers and HWS buffer vessels from MHG Heating are helping Berkeley First to keep the post graduates of Imperial College warm and clean at the 500+ bed accommodation blocks recentley built in Clapham, South West London.

The MHG equipment  was specified by consultants JDA Associates and the mechanical installation was undertaken by A & J Ryan Mechanical Services Ltd.

Phase 1 consists of 452 state of the art studio flats. The heating and hot water demands required a boiler load of 900kW, with 4000L of hot water storage.

Phase 2 consists of 111 state of the art studio flats. The heating and hot water demands required a boiler load of 450kW, with 2000L of hot water storage.

Phase 1 of the project was completed in 2011. Phase 2 is due for completion by mid 2012.