The gym and swimming pool areas of Property Alliance Group’s Oxygen development required works to start before the tower cranes had been removed and ahead of the building being made watertight – ideal conditions for a mould-resistant, quick-to-install product like Specwall which can be installed in all weather conditions.
Using a blockwork alternative would have required a large amount of scaffolding on the 6.2m high walls and doubled the installation period. Using Specwall eliminated this issue and provided significant programme savings for the client.