KNX was specified by the consulting engineers to achieve the complicated lighting control strategies required. KNX also offers the facility for limitless expansion and the ability to specify and seamlessly integrate the most appropriate KNX compliant products from many different manufacturers. The building includes 39 new galleries, staircases, entrances, bridges, walkways and a café within which the lighting is controlled via KNX. In addition, lighting in back of house areas including offices, laboratories, toilets and the boardroom are also managed with KNX.
Across the six levels in the public areas there are 18 lighting control panel locations to match the electrical distribution zones. Each panel houses a variety of equipment to meet the requirements of the project's lighting designers and emergency lighting for each area.
The galleries mainly consist of around 500 switched circuits for ceiling mounted track lighting, feature lighting and display cases. These are switched using 16A C-load actuators and the track circuits are monitored for mains failure. In the event of a local circuit failure, the emergency lighting within the immediate area is activated instantly.
The DALI controlled LED emergency lighting enabled the design team to reduce considerably the capacity of the static inverter, whilst achieving light levels in excess of regulations and including full test and monitoring of the emergency lighting. All non-maintained emergency lighting is activated immediately prior to a static inverter discharge test to provide the full load required. The system is returned to normal after the test and any fitting failures or static inverter faults are reported.
The galleries also benefit from local control switches for out of time schedule operation and in selected areas occupancy detectors are used to reduce lighting loads. The two main public staircases have concealed cold cathode lighting detail that is controlled via scene selection and daylight linking to make the most of the considerable natural light gains.
An internal lux sensor provides accurate measurement to allow the dimmer units to control accordingly. Both these staircases have large areas of glass that generally provide good levels of natural lighting. However, due to the sensitive nature of the artefacts, direct sunlight has to be restricted. Therefore a sun tracking model closes the blinds when the external lux levels are high and the position of the sun makes direct sunlight an issue.
The non-public spaces are fitted with occupancy detection and dimming control benefiting again from DALI lighting and providing energy savings. As with the public areas' emergency lighting, this also provides the ability to monitor the lighting in real time for lamp or ballast failures.
During the scheduled emergency light testing intervals, a report is generated for any inverter, battery or lamp failures on all the self-contained fittings. The KNX/DALI gateway provides the high level functionality that the system demanded.
KSLD were the specialist lighting designers for the project and involved in lighting the front of house areas including the exhibition galleries, two main stair atria and adjacent ancillary areas. The lighting control system was specified by Atelier Ten.
“We have found the KNX system particularly useful for daylight linking at the main atrium, plus for the time clock control across the various zones. The ability to isolate wall switches during the day has also been important as the museum had problems with members of the public 'playing' with the switches during opening hours and upsetting the exhibition lighting. These are now are deactivated during opening hours through the control system. Andromeda Telematics were easy to work with and always looked to accommodate the operational needs of the clients putting in extra time on site with us to resolve any issues," says Hannah Neufeld, Senior Lighting Designer, KSLD.