The new building is the UK’s first purpose built transplantation centre, built as a direct response to the government’s Organ Donation Taskforce recommendation to increase the number of organ donations by 50% by 2013. The institute contains four operating theatres equipped to undertake simultaneous organ transplants, critical care and general inpatient beds, outpatient facilities and a 100 seat lecture theatre and meeting rooms.
The project involved 7100m2 of flooring, which initially received an application of ARDEX DPM 1 C One Coat Surface Damp Proof Membrane. Developed for use as a single coat application, ARDEX DPM 1 C protects the floorcovering installation from residual construction moisture and ground water vapour. ARDEX DPM 1 C is easy to apply and fast curing, enabling the smoothing compound to be laid after as little as 6 hours.
The cured DPM then received ARDITEX RS PLUS, a latex levelling and smoothing compound which provided a smooth and flat surface, perfect for the final vinyl floorcovering. ARDITEX RS PLUS is part of the ARDITEX range of floor levelling and smoothing compounds that continue to offer the professional flooring contractor unique application and performance benefits that help to minimise installation risk.
Commenting on the project, John Kane of Look North Flooring said, “We specify ARDEX flooring systems for our projects as they have been proven many times to ensure a high performance fast track finish and total reliability”.
For further information on the ARDEX product range please telephone 01440 714939, email info@ardex.co.uk or visit ARDEX online at www.ardex.co.uk