Send message to Crushedwall, Redruth, Cornwall
I have read and agree to the terms and conditions of usage and The Building Centre's Privacy Policy. Your request will be sent and shared to the selected manufacturers you submit a request to.

Find products

Use our product finder to search for products and materials

Subscribe to our newsletter to receive news about events and exhibitions, innovation and materials on the latest building product innovations, case studies and more.
I have read and agree to the terms and conditions of usage and The Building Centre's Privacy Policy.

Crushedwall, Redruth, Cornwall

12 Nov 2015
News

Cornwall's mining history, ecology, geology and folklore have all informed briefs for artists' commissions, landscaping and architectural design. Walter Jack Studio designed and built Crushedwall for one of the entrances to the Heartlands project, a community development which celebrates and enriches understanding of the local culture, heritage and natural environment.

"Crushedwall is, for me, about two things. It’s about geology. And it’s about process, the way that things are made." - Walter Jack 

"When we were installing it one of the client team asked if they could touch it. Concrete isn’t known for its tactile qualities. Maybe that’s a first!

"Geology first. Heartlands sits over a very special geology. C19th miners dug an astonishing 1000 metres down through granite to extract tin ore. This is one of the hidden stories that Heartlands will celebrate. When we were asked to design a retaining–wall the geological connection seemed serendipitious. Retaining walls hold back the geology. They are the boundary between our above-ground world and the world of mining.

"And process. One of the things that interests me as a maker is the way in which made things are so much duller than the processes that got them there. Watch glass blowing and you’ll see more beauty there than you’ll ever see in the finished vase! Concrete is not noted for its fluid softness. And yet it is a liquid. We wanted our concrete to tell its own story – to retain the liquidness of its process.

"We started with a sheet of rubber, some plywood and a hired cement mixer in my back garden – and went from there. The final shutter was built in one piece – using a single sheet of rubber 40m long and 4 metres high – a tonne of rubber sheet. The wall needed more height at one end – so the rubber pretty much hangs like a curtain at that end. At the lower end 4 metres of rubber is crumpled down to 1.5 metres. The wall seems to change in mood – as well as shape. It become much stormier at the low end!

Once the shape was formed the shutter was carefully cut into six pieces. One of the challenges was to retain continuity of the fluid form between shutters. The 6 shutters (made by Richard Stump and John Hall) were then taken from the barn in Gloucestershire where they were made to Ladd’s Concrete – only half a mile from the site. We’d done prototypes – but at this point we still didn’t really know whether the plan would work on this scale. The parts, weighing up to 20 tonnes each, were cast offsite and installed with millimetre accuracy – again to ensure continuity of form."

Crushed Wall is open to the public on Station Road in Pool,  Redruth, Cornwall TR15 3DU. For more information, interviews with the artist and images, please contact artist Walter Jack on 07973 261313 or 07973 261 313/0117 939 3336 or Kate Turnbull at the Press Office 01209 722327.

The concrete

  • Material used was Bardon Cemflow a free flowing, self-compacting mix of an architectural grade, used for very high quality finishes.
  • Flows into place removing the requirement of further compacting – important as compacting would have altered the shape being created
  • Specially designed to provide a highly fluid consistency and minimal energy consumption in use
  • Creates high-spec finish reducing and eliminating remedial works or post finishing
  • Bardon Cemflow is designed to reduce placing and finishing time - the enhanced rate of placing that can be achieved allows the scheduling of larger pours or a reduction in working hours required.
  • Volumes of 350m3 to 450m3 of completed flatwork readily available within a normal 10 hour shift. 