Send message to Bolton Gate Co Ltd
Ask a question
Pricing/Quote
List of suppliers/where can I buy
Sample request
I have read and agree to the terms and conditions of usage and The Building Centre's Privacy Policy. Your request will be sent and shared to the selected manufacturers you submit a request to.

Find products

Use our product finder to search for products and materials

Subscribe to our newsletter to receive news about events and exhibitions, innovation and materials on the latest building product innovations, case studies and more.
I have read and agree to the terms and conditions of usage and The Building Centre's Privacy Policy.

1 Puddle Dock, Blackfriars

10 Sep 2024
Case study

As part of the refurbishment of this 1970’s building, Bolton Gate were specified to provide a hybrid grille / shutter to the loading bay.

In addition to providing vehicular entry / egress with the requisite ventilation for such an application, matching side panels were required with integral hinged doors to allow personnel access and provide emergency exits.

A special bottom rail was deigned to cope with the sloping floor level and intermediate posts were designed and installed to support the side guides and panels.

The grille / shutter operates via a keypad outside, loop detectors inside and photocells / safety edge were provided to meet Health & Safety requirements.

The whole assembly was powder coated brown in keeping with the surrounding structure.

Keep exploring